The depth and breadth of the Builders Resources portfolio reflects our diverse capabilities and areas of expertise. We specialize in complex, challenging projects, regardless of size or financial boundaries, and we are continually expanding our in-house resources to address new challenges and opportunities.
Check our portfolio for a specific area of specialty. Or contact us, and we’ll help you explore innovative solutions to your particular construction challenge.
No. |
PROJECT TITLE
|
YEAR OF EXECUTION |
CLIENT |
MAN HOURS (khrs) |
1 |
FABRICATION OF PIPELINE FLOATERS AND PIPE CLAMPS |
2006-2007 |
WILLBROS/B+B CONSORTIUM - EGGS1 PROJECT |
18 |
2 |
OML 58 WATCH TOWERS OBAGI |
2006-2007 |
EPNL |
8 |
3 |
OFFICE CONTAINERS PORT HARCOURT |
2007 - 2007 |
JULIUS BERGER |
6 |
4 |
SAMBREIRO RIVER BLOCK VALVE II PLATFORM |
2007 - 2007 |
WILLBROS/B+B CONSORTIUM ON EGGS1 PROJECT |
15 |
5 |
FABRICATION OF STEEL STRUCTURAL FRAME- YENAGOA |
2007 - 2008 |
F & C NIGERIA LIMITED |
21 |
6 |
ERECTION OF SUBSEA WARE HOUSE/OVER HEAD CRANE – EXPRO TECH |
2008 - 2008 |
RED SEA GROUP |
4.5 |
7 |
WARE HOUSE PORT HARCOURT |
2008 - 2008 |
C.I.C NIGERIA LIMITED |
3 |
8 |
CONSTRUCTION OF STOOLS AND LADOL BEAMS FOR CABLE REELS |
2008 - 2008 |
SDV |
1.5 |
9 |
SECURITY UPGRADE PHASE 1 (OML 100) FOR EDIKAN |
2008 - 2008 |
EPNL |
1.2 |
10 |
EDIKAN, IME & ODP1 ELECTRICAL ROOM REPAIR (OML 100) |
2008 - 2008 |
EPNL |
1.8 |
11 |
CONSTRUCTION OF ACCOMMODATION CABINS FOR IZOMBE FLOW STATION |
2008 - 2009 |
addax |
11 |
12 |
CONSTRUCTION OF OFFICE CONTAINERS |
2008 - 2008 |
DELATTRE BEZONS NIGERIA |
1.6 |
13 |
FABRICATION OF ONE DIESEL TANK |
2008 - 2008 |
TEPNG |
0.8 |
14 |
CONSTRUCTION OF ACCOMMODATION CABINS FOR OML 58 UPGRADE |
2009 - 2010 |
TEPNG |
2.1 |
15 |
INSTALLATION OF LOCKABLE HATCHES ON AMP1 AND AMP2 |
2009 - 2009 |
TEPNG |
3.2 |
16 |
METHANOL HOSE CONTAINER BASKETS |
2009 - 2009 |
TUPNI |
5 |
17 |
CONTAINER BASKETS |
2009 - 2009 |
TUPNI |
4 |
18 |
RELOCATION OF WATCH TOWERS - TRANSPORTATION & INSTALLATION AT OBAGI |
2009 - 2009 |
TEPNG |
3.9 |
19 |
OFD2 & OFP1 BOAT LANDINGS INSTALLATIONS |
2009 - 2009 |
TEPNG |
3 |
20 |
OFD2 & OFP1 BOAT LANDINGS INSTALLATIONS |
2009 - 2009 |
TEPNG |
3 |
21 |
AFD1, IMD1, ODD1 & ODP1 PLATFORMS BOAT LANDINGS REPLACEMENT |
2009 - 2009 |
TEPNG |
15 |
22 |
OML-99 ADDITIONAL SECURITY UPGRADE AT AMENAM(AMQ GAMES ROOM UPGRADE TO SAFE ROOM) |
2009 - 2010 |
TEPNG |
22 |
23 |
AMT2 FLARE PLATFORM HEAT SHIELDING |
2009 - 2010 |
TEPNG |
12 |
24 |
AFIA & IME CORRODED ANNULUS DECOMPRESSION LINES REPLACEMENT |
2009 - 2010 |
TEPNG |
10 |
25 |
ODP, ODD & OFD2 – REPLACEMENT OF CORRODED SPOOLS |
2009 - 2011 |
TEPNG |
28 |
26 |
PROVISION OF RECREATIONAL FACILITIES IN OML 124 |
2009 - 2010 |
ADDAX |
4 |
27 |
FSO UNITY TOPSIDES OFFLOADING BUOY RISER MODIFICATION |
2009 - 2010 |
TEPNG |
1.5 |
28 |
REPAIR OF AMD1/ AMD2 BLOCKED VENTS AND CORRODED UTILITY STATIONS (OML-99) |
2009 - 2010 |
TEPNG |
2.2 |
29 |
WASTE SKIPS |
2009 - 2009 |
TUPNI |
8 |
30 |
CEMENT SILOS |
2010 - 2010 |
OKMAS |
2.3 |
31 |
MTB-1158 REPLACEMENT OF OPERATOR’S OFFICE/STORAGE IN OML-124 |
2010 - 2010 |
ADDAX |
2.3 |
32 |
CONSTRUCTION OF ACCOMMODATION CABINS FOR OML 58 UPGRADE PROJECT |
2010 - 2010 |
PONTICELLI |
3.6 |
33 |
HYDRAULIC FLYING LEAD DEPLOYMENT FRAME AND CHUTES |
2010 - 2010 |
TUPNI |
4 |
34 |
CARGO BASKETS |
2010 - 2010 |
TUPNI |
1.8 |
35 |
CONSTRUCTION OF ACCOMMODATION CABINS FOR OML 58 DRILLING CAMPAIGN |
2010 - 2010 |
TEPNG |
3 |
36 |
CONSTRUCTION OF OFFICE ACCOMMODATION CABINS FOR ISAN LACT PROJECT |
2010 - 2010 |
CHEVRON |
2.5 |
37 |
ODD1 PRE-RIG ARRIVAL WORKS |
2010 - 2011 |
TEPNG |
9.8 |
38 |
PRERIG ARRIVAL WORKS IN IMD |
2010 - 2011 |
TEPNG |
8.5 |
39 |
CUNI FLANGES REPLACEMENT IN ODD1 AND IMD1 |
2010 - 2010 |
TEPNG |
6 |
40 |
OFON CORRODED PIPING REPLACEMENT CAMPAIGN PHASE 1 (PACKAGE 3 – OFD2) |
2011 - 2011 |
TEPNG |
8 |
41 |
AMP1 REPAIR WORKS ON FIRE WATER PUMP ENCLOSURES & ESSENTIAL DIESEL GENERATOR |
2011 - 2011 |
TEPNG |
5.5 |
42 |
OML 100 HIGHER CAPACITY BIOCIDE INJECTION PUMPS |
2011 - 2013 |
TEPNG |
3.8 |
43 |
REPLACEMENT OF CORRODED NOZZLES ON 21 DA 301 AT OFD1 |
2011 - 2011 |
TEPNG |
5.3 |
44 |
METHANOL HOSE CONTAINER BASKETS |
2011 - 2011 |
TUPNI |
5 |
45 |
SECURITY UPGRADE OF BEAU GESTE BARGE – PHASES 1 & 2 (ONSHORE WORK AT ONNE AND OFFSHORE) |
2011 - 2011 |
TUPNI |
12 |
46 |
IMD1 BOAT LANDING SECURITY WORKS |
2011 - 2011 |
TEPNG |
9 |
47 |
AMP1 MODIFICATION OF TEST SEPARATOR TO TEST HIGH GAS FLOW WELLS |
2011 - 2011 |
TEPNG |
1.4 |
48 |
ODD1 CORRODED WELLS & TRANSFER SYSTEM REPLACEMENT |
2011 - 2012 |
TEPNG |
7.2 |
49 |
CONSTRUCTION OF ACCOMMODATION CABINS FOR JESIKE FACILITY |
2011 - 2011 |
CHEVRON |
8 |
50 |
ODP1/ODD1 MCDRS, VESSELS & OTHER MISCELLANEOUS SYSTEMS |
2011 - 2012 |
TEPNG |
7.1 |
51 |
IMD1 BOAT LANDING SECURITY WORKS |
2011 - 2011 |
TEPNG |
9 |
52 |
ODD1 CORRODED SEPARATION SYSTEM, DRAIN & AIR SYSTEMS REPLACEMENT |
2011 - 2012 |
TEPNG |
11.3 |
53 |
OML 58: CONNECTION OF OB 113/4 FLOW LINE TO OB 55/5 FLOW LINE |
2011 - 2011 |
TEPNG |
4.6 |
54 |
OML 58 OBAGI FLOW STATION OLD NPS PIPING REPLACEMENT |
2011 - 2013 |
TEPNG |
13.3 |
55 |
OML58 2011 SHUTDOWN SCAFFOLDING AND INSULATION WORKS |
2011 - 2011 |
TEPNG |
5.6 |
56 |
OML102 –REPLACEMENT OF CORRODED VENT LINE ON CHLORINATION UNIT AT OFP1 |
2012 - 2012 |
TEPNG |
1.6 |
57 |
OML102: FABRICATION OF 3NOS CHEMICAL RECOVERY DRUMS FOR OFP1, OFD1 & OFD2 |
2012 - 2012 |
TEPNG |
2.2 |
58 |
OML100: RE-INSTATEMENT OF ACCESSIBILITY TO SOUTH-EAST BOATLANDING ON EDD1 |
2012 - 2014 |
TEPNG |
4.4 |
59 |
OFP1 HELIDECK PAINTING |
2012 - 2012 |
TEPNG |
1.6 |
60 |
FABRICATION OF 4NOS CHEMICAL RECOVERY DRUMS FOR ODD1,ODP1,IMD1 AND AFDI CHEMICAL TRAYS AND DRAINS |
2012 - 2013 |
TEPNG |
1.8 |
61 |
ODP1 DELUGE SYSTEM MODIFICATION |
2012 - 2012 |
TEPNG |
3.5 |
62 |
OML102 – OFON STRUCTURAL INTEGRITY WORK |
2012 - 2013 |
TEPNG |
6.4 |
63 |
OML102 – REPAIR ON OFON FIRE WATER PIPING AND ASSOCIATED SUPPORTS |
2012 - 2013 |
TEPNG |
8.1 |
64 |
OML100: ODD1 2012 SHUTDOWN ADDITIONAL WORK (DRAIN LINES AND INSTRUMENT AIR LINES) AND AFIA-ODD OIL IMPORT LINE REPAIR |
2012 - 2012 |
TEPNG |
5.5 |
65 |
AMP2 GLYCOL REBOILER (46EC641) REPAIR |
2012 - 2013 |
TEPNG |
3.7 |
66 |
OML100: AFIA / IME ANNULUS DECOMPRESSION LINES AND GAS LIFT INJECTION LINES |
2012 - 2013 |
TEPNG |
4.6 |
67 |
OML100: ODD1 / ODP1 MINOR STRUCTURAL REPAIR WORKS |
2012 - 2012 |
TEPNG |
4.2 |
68 |
OML100: ODD1 WELLS SPOOLS RE-INSTATEMENT AND ODP1/ ODD1 BRIDGE REPAIR WORK |
2012 - 2013 |
TEPNG |
7.3 |
69 |
OML100: SECTIONAL REPLACEMENT OF 4” ODD1 - AFD1 AND ODD1 - IMD1 RISERS |
2012 - 2012 |
TEPNG |
5.3 |
70 |
CONSTRUCTION OF CABINS FOR DAEWOO OML58 IPP SITE |
2012 - 2012 |
DAEWOO |
6.7 |
71 |
OML100: ODD1 / ODP1 CORRODED GRATING AND STAIR THREADS REPLACEMENT |
2012 - 2012 |
TEPNG |
5 |
72 |
CONSTRUCTION OF CABINS |
2012 - 2012 |
OMEGA MARITIME |
4.4 |
73 |
OML99 – AMP1 20INCHES CRUDE OIL MP HEADER SECTIONAL REPLACEMENT |
2012 - 2012 |
TEPNG |
4.4 |
74 |
FSO OILY WATER TREATMENT UPGRADE(ONSHORE WORKS COMPLETION-WP 2 PIPING) |
2012 - 2013 |
TEPNG |
14.4 |
75 |
OML102 - REPAIR OF CRACK AND LEAK ON RECYCLING |
2012 - 2012 |
TEPNG |
4.5 |
76 |
OML102 WELD REPAIR OF OFON AIR VESSEL 22-DA-851 AT OFD2 |
2012 - 2012 |
TEPNG |
3 |
77 |
OFS – SUPPLY AND INSTALLATION OF 8 NOS. CABINS |
2012 - 2012 |
TEPNG |
17 |
78 |
SUPPLY OF 6 NOS. CABINS |
2013 - 2013 |
TEPNG |
6.3 |
79 |
OBAGI FLARE SYSTEM INTERVENTION WORKS PACKAGE 1- CONSTRUCTION OF A NEW TEMPORARY FLARE LINE |
2013 - 2013 |
TEPNG |
7.1 |
80 |
OML99 – FABRICATION OF 46-GX-731 A/B/C DISCHARGE SPOOLS |
2013 - 2014 |
TEPNG |
3.3 |
81 |
OML100: MODIFICATION OF PIG RECEIVER DOORS |
2013 - 2014 |
TEPNG |
5.4 |
82 |
OML 58 OBAGI FLOWSTATION MIDTERM FLARELINE (NEW FLARE LINE ON CAUSEWAY) |
2013 - 2013 |
TEPNG |
4.5 |
83 |
OML100 – FSO UNITY CORRODED HULL REPAIR WORKS |
2013 - 2014 |
TEPNG |
6.7 |
84 |
OML 99 – AMP2 - REPAIR OF CORRODED 2” OXYGEN SCAVENGER NOZZLE OF 46CA723 |
2013 - 2013 |
TEPNG |
5.5 |
85 |
ECP ONNE (FLT) CARGO BASKETS REPAIRS AND LOAD TEST CERTIFICATION |
2013 - 2013 |
TEPNG |
2.1 |
86 |
FABRICATION AND ERECTION OF AW 139 CORPORATE AVIATION IA HELICOPTER HANGER AT SPDC IA |
2013 - 2015 |
SPDC |
34 |
87 |
OML 100, FSO UNITY DAMAGE/MISSING FENDERS AND IMPACT RESIN WITH BOLTS & NUTS |
2013 - 2014 |
TEPNG |
2 |
88 |
O.U.R PIPE LAYING (PACKAGE 2) OF PIPING & ASSOCIATED EQUIPMENT FOR O.U.R BYPASS LINE AT OGP |
2013 - 2014 |
TEPNG |
15.7 |
89 |
OML99: “AMD1 REPLACEMENT OF CORRODED GALPERTI HUB CLAMPS AND VALVES HANDLES |
2013 - 2014 |
TEPNG |
5.4 |
90 |
OML99: “AMD2 REPLACEMENT OF CORRODED GALPERTI HUB CLAMPS AND VALVES HANDLES |
2013 - 2014 |
TEPNG |
4.1 |
91 |
OML100 – REPLACEMENT OF CORRODED FIRE WATER PIPING AT IMD1, ODD1 AND EDD1 |
2014 - 2014 |
TEPNG |
7.2 |
92 |
OB 125 POST RIG PIPING REINSTATEMENT |
2014 - 2014 |
TEPNG |
3.2 |
93 |
SECTIONAL REPLACEMENT OF 16” HP CRUDE HEADER AT AMD1/AMD2 |
2014 - 2014 |
TEPNG |
13 |
94 |
REPLACEMENT OF BEAU GESTE BARGE BOAT LANDING |
2014 - 2014 |
TEPNG |
3.9 |
95 |
OML58 – IBEWA 15 PIPING MODIFICATION DUE TO CHOKE VALVE DIMENSION MISMATCH |
2014 - 2015 |
TEPNG |
4.3 |
96 |
OML 58 OLD NPs PIPING REPLACEMENT PUNCH LIST CLOSE OUT WORKS |
2014 - 2015 |
TEPNG |
4.7 |
97 |
CONTRACT FOR PRESSURE VESSELS CLEANING, PREPARATION, DESANDING AND HYDROTESTING ON OML 58 (OBAGI FLOW STATION) |
2014 - 2015 |
TEPNG |
7.9 |
98 |
CONTRACT FOR PRESSURE VESSELS CLEANING, PREPARATION, DESANDING AND HYDROTESTING ON OML 58 (IBEWA CLUSTER) |
2014 - 2015 |
TEPNG |
3.1 |
99 |
CONSTRUCTION OF IT SOLUTION CENTRE (ITSC) AT ADMIN E,QIT |
2014 - 2015 |
EXXON MOBIL |
2.1 |
100 |
RECONNECTION OF IBW10 AND IBW11 FLOWLINES |
2015 - 2015 |
TEPNG |
2.3 |
101 |
BONNY TELECOM MAST 2014 CAMPAIGN PUNCH-LIST CLEARANCE |
2014 - 2015 |
TEPNG |
3.2 |
102 |
OML99 –AMENAM 16” HP HEADER REPAIR –SECTIONAL REPLACEMENT REPAIR |
2015 - 2016 |
TEPNG |
2.1 |
103 |
OML99 –AMENAM 16” HP HEADER REPAIR – SLEEVES TEST (ONE-OFF) AND SLEEVES REPAIR (CALL-OFF) |
2015 - 2015 |
TEPNG |
1.8 |
104 |
FSO UNITY TANK WASHING LINES & CREVICE CORROSION BETWEEN 4” & ABOVE PIPELINES AND SUPPORT CAMPAIGN |
2015 - 2017 |
TEPNG |
4.8 |
105 |
OML100 ICSS UPGRADE PROJECT STRUCTURAL FAB & SCAFFOLDING SCOPE CLARIFICATIONNT |
2015 - |
INTECH/TEPNG |
ON-GOING |
106 |
OML99 – AMENAM 16” HEADER REPAIR – SECTIONAL REPLACEMENT REPAIR (CALL-OFF) - REPAIRS OF 16'' LEAKING HUB AT AMD1 |
2015 - 2017 |
TEPNG |
0.78 |
107 |
OML102 – OFON WELL 45 FLOW LINE AND E&I REMEDIAL WORKS |
2016 - 2017 |
TEPNG |
4.8 |
108 |
OML102 – OFON WELL 46 FLOW LINE AND E&I REMEDIAL WORKS |
2017 - 2017 |
TEPNG |
4.8 |
109 |
OML102 – OFON WELL 47 FLOW LINE AND E&I REMEDIAL WORKS |
2017 - 2017 |
TEPNG |
4.8 |
110 |
OML102 – OFON WELL 48 FLOW LINE AND E&I REMEDIAL WORKS |
2017 - |
TEPNG |
ON-GOING |
111 |
OML102 – OFON WELL 49 FLOW LINE AND E&I REMEDIAL WORKS |
2017 - |
TEPNG |
ON-GOING |
112 |
OML100-PREFABRICATION OF NEW FSO UNITY SEA WATER FILTER AND REPAIR OF LINES AT FSO & ODP1 |
2017 - |
TEPNG |
ON-GOING |
113 |
OML99 – REPLACEMENT OF LEAKING SECTIONS |
2017 - |
TEPNG |
ON-GOING |
The company stands ready to handle important and large projects mainly in the following fields: